Remove Monitoring Remove Risk Remove Transportation
article thumbnail

Industrial Construction: Examples of Industrial Projects

ProjectManager.com

This is why industrial construction has special conveyance requirements, such as 24/7 shipping and receiving and accessibility to air and rail transport or major highways. As we’ve mentioned, industrial construction is built in proximity to transportation and needs space to accommodate heavy machinery. Location is another difference.

article thumbnail

Six Sigma: A Simple Guide for Project Managers

ProjectManager.com

A staff with Six Sigma expertise is also usually hired to monitor the process. Test those solutions, and figure out what risks are inherent. Control: In order to make sure that these improvements are sustainable, monitor them by creating a control plan. It’s suggested that focusing on the simplest and easiest solution is best.

Lean 417
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Everybody Should Know About Controlling Risks

Project Risk Coach

Many project managers do a great job of identifying risks. Some even evaluate risks and develop response plans. However, project managers get busy as their projects progress and fail to control risks, resulting abandoned or wrecked projects. So, what does it mean to control risks? Do Project Managers Really Control Risks?

article thumbnail

How to Create an Event Budget

ProjectManager.com

Prices for things change and there’s an inherent risk in putting together an event that can impact your budget. Monitoring costs in real time helps you stay on budget. To do that you need to monitor your actual costs and compare them with the planned costs for the event. Get started with ProjectManager today for free.

Budget 355
article thumbnail

Risk Management in Wedding Planning: Preparing for the Unexpected

Binfire

Just like project managers prepare for unforeseen risks in their professional endeavors, wedding planners and couples must anticipate and manage potential issues that could arise before or during the big day. Here’s how you can identify, assess, and manage risks in wedding planning.

article thumbnail

How to Calculate Total Manufacturing Cost

ProjectManager.com

Then there are other indirect manufacturing costs that can include items such as machine depreciation, land rent, property insurance, electricity, freight and transportation and other expenses that keep the factory operating but aren’t directly related to the manufacturing of the finished product.

article thumbnail

Smart Manufacturing: Examples & Benefits

ProjectManager.com

In smart manufacturing, the use of digital twins can increase efficiency and productivity by monitoring and analyzing performance and solving problems quickly. Because it’s constantly monitoring production in all its aspects, smart manufacturing also creates advanced maintenance. That reduces downtime and maintenance costs. In the U.S.,