Remove Magazine Remove Project Cost Remove Underperforming Technical Team
article thumbnail

Henry Gantt’s Biography & Role in Gantt Chart History

ProjectManager.com

He’s best remembered for the tool that bears his name and his works in the development of what’s called scientific management. While Gantt charts are named after Henry Gantt, the first Gantt chart was developed by Karol Adamiecki, a Polish engineer, in the mid-1890s. It was later renamed the Taylor Society.

article thumbnail

Optimizing Portfolio Profit through DIPP-guided Resource Allocation

Epicflow Blog

Yet it is the most important of the three – because it generates the project’s value. Exhibit 1: The Three Sides of the Triple Constraint Triangle We have done so bad a job of dealing with that third side that there is not even unanimity on how it should be labeled. If not, don’t do it! A DPI above 1.0

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Estimating is a Learned Skill

Herding Cats

The same process for estimating is applied to multi-billion dollar projects we work. And the same process is applied to the Scrum development processes on those projects. . Numerical anchors and their strong effects on software development effort estimates,” Erik Løhrea, and Magne Jørgensen, Simula Research Laboratory, Oslo.

article thumbnail

Software Estimating Resources

Herding Cats

This blog page is dedicated to the resources used to estimate software-intensive systems using traditional and agile development methods. Cost Modeling Agile Software Development,” Maarit Laanti and Petri Kettunen, International Transactions on Systems and Applications, Volume 1 Number 2, pp. Performance Evaluation of non?