Remove Influencer Remove Performance Measurement Remove Seminar
article thumbnail

A Compendium of Works to Increase the Probability of Project Success

Herding Cats

The Nine "I's" of Program Success ," College of Performance Management. Five Immutable Principles of Project Success , PMI Spring Seminar, 2021, Austin TX. Forming, Storming, Norming, Performing, and Adjourning. Project Performance Management. Building a Credible Performance Measurement Baseline.

2003 54
article thumbnail

PROJECT MANAGEMENT BENCHMARKING, an excellence enabling instrument

International Institute for Learning

Proceedings from seminars and symposiums on general project management concepts. Proceedings from seminars and symposiums specializing in project management best practices. The results must be carefully analyzed to account for cultural differences, political factors, and possibly the influence of local religions.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). But each method needs to be based on 5 Immutable principles to be successful, no matter the domain or context, PMI Spring Seminar , 2012, Austin TX. Risk Management (#RM).

article thumbnail

A Guide to Business Process Reengineering (BPR)

Wrike

For example, a construction company and a technology company have different systems, workflows, and challenges – all of which influence the reengineering process efforts. These videos include seminars delivered by one of the founders of the management theory of business process reengineering, Dr. Michael Hammer.

Process 36
article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

Measures of Effectiveness, Measures of Performance, Technical Performance Measures, and Key Performance Parameters describe the measures of these expectations. risks that affect the cost and schedule measures of the program. Programmatic ? All risk comes from Uncertainty. and Dutta, P.,