article thumbnail

Next Generation Project Management Software

Rebel’s Guide to PM

It covered identifying requirements, interconnecting tasks, resources, planned values, actual values, baselines, performance measures, forecast techniques and timesheets. She graduated in Mathematics and with an MBA in Global Management.

article thumbnail

A Compendium of Works to Increase the Probability of Project Success

Herding Cats

Project Performance Management. Connecting the 5 Principles and 5 Practices of Performance-Based Project Management ® To Increase the Probability of Project Success. Building a Credible Performance Measurement Baseline. Measures of Product Value is Exchange for Its Cost. Technical Performance Measures.

2003 54
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Fallacy of the Day

Herding Cats

Let's look at the measures for the Product or Service independently from its application in the business or fulfillment of the Mission. Here are definitions from "Technical Measurement," INCOSE-TP-2005-020-10. These measures are the basis of project success from the technical point of view. INCOSE-TP-2005-020-10.

2005 37
article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Project Performance Management. Building a Credible Performance Measurement Baseline - without a good foundation, nothing can be built. Risk Management (#RM).

article thumbnail

What's Missing from the Agile Software Development Paradigm

Herding Cats

Without knowing what Done Looks Like, in units of Measures of Effectiveness and Measures of Performance. Technical Performance Measures (TPM) - are defined at the start of a program—the planned progress of selected technical parameters. These MoE's and MoP's and other starts at the systems level [6].

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

When actual measures of cost, schedule, and technical performance are outside the planned cone of uncertainty, corrective actions must be taken to move those uncertanties inside the cone of uncertanty, if the project is going to meet it's cost, schedule, and technical performance goals. . Resources. [1] 10] Boehm, B.,

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

The Measures that are modeled in the Cone of Uncertainty are the Quantitative basis of a control process that establishes the goal for the performance measures. This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM). Resources. [1] 10] Boehm, B., 11] Cohn, M.